Critical Water Supply Pipework Replacement

Solution Provided | Identified and analysed gaps in the previously acquired design information, reviewed the original design and recommended further work required to complete the project.

Discipline | Process Engineering, Mechanical Engineering, Structural Engineering, Electrical & Instrumentation Engineering and Design

Carnac – Project Delivery Services Pty Ltd (Carnac) conducted a Gap Analysis that reviewed the original design requirements, subsequent scope changes and current level of design completion of a project to replace critical water supply pipework throughout a TiO2 processing plant and to the neighbouring third party facilities.

Recommendations | Carnac prepared 3 options for the completion of work which included providing 2D general arrangement drawing updates, 3D modelling modifications, piping isometrics, hydraulic modelling, constructibility planning and hazard analysis.

Picture 1.png
Picture 2.png