Brine Chiller Upgrade

Project Value | $2m

Solution Provided | Detailed Engineering Design

The client required the installation of a new Brine Chiller at their facility, which was to be installed in a purpose-built machinery room and tied to the existing brine and cooling water reticulation system. The scope of work involved Carnac’s provision of engineering services at a detailed design level for the project. This was a multi-disciplinary job, delivering outcomes with regards to process and instrumentation, mechanical and electrical works, and civil and structural design.