Carnac was engaged to review the original concentrate slurry pipeline designs and optimisation plans and provide recommendations for throughput improvement.
Remote Operating Centre Process Dashboards
Fines Plant Process Review
Balanced Machines Greenfields Execution
Programme Management for Priority Works Projects
Mine Dewatering
As the life of mine has developed, some pits have progressed to below water table operations. Carnac was engaged by the client to undertake a study to assess the preliminary engineering study performed internally by the client and identify further work to progress design with regards to plans for dewatering.
Dewatering Pipeline Relocation
Mine Sustaining Project
The client aims to expand production rates from 24Mtpa of iron ore to 28Mtpa by 2015. The ore is processed on site before being loaded onto rail. Carnac was commissioned to provide advice and recommendations regarding options to realise sustained production with lower operating costs, with works expected to be implemented between 2015 and 2017.